How optimization reduces your costs?

CAPEX savings

  • Teradata hardware investments can be postponed or cancelled Read more
    Does your Teradata system run at full capacity, and it is told that you must invest to new hardware?
    Applying PRISE products the resource requirements of load jobs and queries can be significantly reduced, therefore the current capacity can be enough to serve the actual and event future demands.
    Optimization usually makes it possible to postpone hardware-investments by 6 to 12 months or eventually they can even be can (from optimization point of viewcelled, which may result savings of up to millions of USD.
  • Optimization costs you peanuts compared to hardware Read more
    Every GB of capacity released by optimization costs the fraction of buying the same capacity as new hardware.
  • No downtime, no waiting Read more
    Adding new hardware elements are not only expensive but time-consuming as well: you have apply for investments, wait for approvals, order, delivery, installation. In addition, resource-extensions can be done in larger steps only, that may exceed the requirements, while optimization can be done in much finer grain. Furthermore, optimization can be done without any system downtime.

OPEX savings

  • • Stop increasing your Teradata support fee or even decrease it! Read more
    Teradata support fee is typically based on system performance capacity (TPerf). If you run out of resources and must extend the hardware, the support fee will increase along with the higher system TPerf.
    Optimization enables you to keep these costs on a low level, or they can be even reduced in case resources are freed up and the Capacity-on-Demand feature can be activated to lower the effective TPerf - and with it, also the support fee.

Specific cost-savings

  • Cost of a task decreases Read more
    One optimized report / job will consume less resources therefore its specific cost is lower.
  • Current capacity is eligible for more tasksRead more
    The current system (at actual expense level) can handle more reports / tasks without hardware extension if system is optimized.

Collateral costs decrease

  • Less delayRead more
    Delayed reports usually cause wasted labour time, and late information may lead to wrong business decisions. Both causes significant hidden costs that can be eliminated by optimization.
  • Maintained system healthRead more
    Supervise and maintain a system in healthy status usually costs lot less than initiate urgent emergency projects when the performance gets unacceptable. In addition well maintained system performance goes hand in hand with user satisfaction.

Check out how the PRISE products can help optimizing your system!